Pattern: V from n
The pattern can be best understood by viewing the interactive construction network link above.
To examine the individual constructions please see the tables below:
Examples |
---|
The infrequency of inspections in some areas must detract from the quality of schooling. (BNC)
Since then firms … have preferred to borrow from banks. (BNC) The amount and timing of future cash flows resulting from a proposed investment are calculated… (BNC) He still shrank from returning to England. (BNC) There is always a danger in generalising from individual writing. (BNC) |
« Back to Construction Pattern List